/ realizations

Our
projects

Scroll

Production and storage hall

BARTEX Żagań

/ project objective
Construction of the production and storage hall including social and office building and boilerhouse
/ hall area
4 300 m2
/ office building area
540 m 2
/ paved areas
2 400 m 2
/ Scope of work
  • preparation of executive design of the structure,
  • preparation of executive design of electrical installations,
  • preparation of executive design of sanitary installations, central heating, ventilation and air conditioning,
  • preparation of interior design project,
  • execution of earthworks and foundation works,
  • delivery and assembly of steel structure,
  • delivery and assembly of wall sanwich panels,
  • delivery and assembly of roof covering of the hall and office building,
  • delivery and assembly of window and door joinery and locksmithery,
  • delivery and assembly of sectional gates,
  • turnkey construction of the office building and boilerhouse,
  • execution of floor bedding made of crushed stone aggregate,
  • execution of industrial flooring,
  • execution of internal and external electrical installations,
  • execution of external installations: storm water drainage, sewage system and water supply network including connections to the municipal sanitary sewer,
  • execution of internal installations: central heating system with boiler room, plumbing, compressed air installation, hydrant installation,
  • delivery and assembly of ventilated facade made of fibre-cement panels,
  • execution of finishing works in the social and office building,
  • execution of concrete pavings,
  • delivery and assembly of fencing with full set of sliding gates,
  • development of green areas.

Visualisations

Completed investment

Building process

Similar projects